A solar system is not finished when the last panel is fixed. Before it is switched on and handed over, it is tested and set up, and the results are recorded. Green Solar Solutions carries out string testing, checks of open-circuit voltage and short-circuit current, electrical certification and a safe handover.

Why a system is tested before it is used

A solar installation produces DC voltage whenever it is light, and it cannot be switched off at the panels. Testing shows that the wiring is correct, that every connection is sound and that the system is safe to energise. Mistakes found at this stage are much easier and safer to correct than after the system has been running.

String testing, Voc and Isc

Each string of panels is tested before it is connected to the inverter. The open-circuit voltage (Voc) shows that the right number of panels are connected correctly and that the string voltage matches the design. The short-circuit current (Isc) shows that the panels are delivering current as expected. A reading that is off points to a wiring or panel problem to resolve first.

Electrical safety tests

The DC and AC sides are tested for polarity, continuity of protective conductors, insulation resistance and the operation of protective devices. Grid-connected PV systems have their own British and European testing standard, BS EN 62446-1, and the installation is carried out to BS 7671, the IET Wiring Regulations.

Commissioning

Once the tests are passed, the system is switched on and the inverter is set up: the grid settings, the battery settings if there is a battery, and the connection to the monitoring app. Isolators are labelled and the shutdown procedure is confirmed.

Handover and documentation

At handover you are shown how to read the monitoring, what normal output looks like and how to isolate the system, and you receive the documentation for it. If an export tariff or a scheme asks for specific paperwork, such as MCS documentation, raise it when you ask for a quote so that it can be discussed in advance.

Simple, in a few steps

How we work

  1. 01

    Get in touch

    Email us the address, the type of property and what you would like the system to do.

  2. 02

    Share the details

    Photos of the roof and of the consumer unit help us understand the job.

  3. 03

    Agree the plan

    We discuss the design, the price and the timing directly with you before anything is booked.

  4. 04

    Installation

    Our teams install the panels, the wiring, the inverter and any battery.

  5. 05

    Testing and handover

    The system is tested, commissioned and explained to you before we leave.

Questions about system testing & commissioning

What is string testing?

It is the testing of each group of panels (a string) before connection to the inverter, to confirm that the voltage and current are what the design expects.

Will I receive paperwork?

Handover includes the documentation for the system. If a tariff or a scheme you want to use needs something specific, tell us in advance.

Do I need to be there at handover?

It helps. This is when you are shown how to read the monitoring and how to switch the system off.

London & the South East

Where we work

We work across London & the South East. Not sure we reach you? Email us and ask.

Ready to start?

Ask for a quote for your project

Tell us what you need and where the property is. We will discuss price and timing with you directly.

Get a quote

This opens your email app with the message filled in; you send it yourself. See our privacy notice. Or write to craita.claudiu.ionut94@gmail.com.

Email us